The status of the SARAF linac project

L. Weissman, D. Berkovits, I. Eliyahu, I. Gertz, A. Grin, S. Halfon, G. Lempert, I. Mardor, A. Nagler, A. Perry, J. Rodnizki, K. Dunkel, M. Pekeler, C. Piel, P. Vom Stein, A. Bechtold

Research output: Contribution to conferencePaperpeer-review

Abstract

Phase I of the Soreq Applied Research Accelerator Facility, SARAF, has been installed and is currently being commissioned at Soreq NRC [1]. According to the Phase I design, SARAF should yield 2 mA proton and deuteron beams at energies up to 4 and 5 MeV, respectively. The status of the main Phase I components is reported. We further present beam commissioning results, which include acceleration of a 1 mA CW proton beam up to 3 MeV. Further improvements in the facility in order to achieve the desired performance are discussed.

Original languageEnglish
Pages679-683
Number of pages5
StatePublished - 2011
Externally publishedYes
Event25th International Linear Accelerator Conference, LINAC 2010 - Tsukuba, Ibaraki, Japan
Duration: 12 Sep 201017 Sep 2010

Conference

Conference25th International Linear Accelerator Conference, LINAC 2010
Country/TerritoryJapan
CityTsukuba, Ibaraki
Period12/09/1017/09/10

Fingerprint

Dive into the research topics of 'The status of the SARAF linac project'. Together they form a unique fingerprint.

Cite this