TY - JOUR
T1 - The Price of Bounded Preemption
AU - Alon, Noga
AU - Azar, Yossi
AU - Berlin, Mark
N1 - Publisher Copyright:
© 2021 ACM.
PY - 2021/4
Y1 - 2021/4
N2 - In this article we provide a tight bound for the price of preemption for scheduling jobs on a single machine (or multiple machines). The input consists of a set of jobs to be scheduled and of an integer parameter k ≥ 1. Each job has a release time, deadline, length (also called processing time), and value associated with it. The goal is to feasibly schedule a subset of the jobs so that their total value is maximal; while preemption of a job is permitted, a job may be preempted no more than k times. The price of preemption is the worst possible (i.e., largest) ratio of the optimal non-bounded-preemptive scheduling to the optimal k-bounded-preemptive scheduling. Our results show that allowing at most k preemptions suffices to guarantee a Θ(min {logk+1 n, logk+1P}) fraction of the total value achieved when the number of preemptions is unrestricted (where n is the number of the jobs and P the ratio of the maximal length to the minimal length), giving us an upper bound for the price; a specific scenario serves to prove the tightness of this bound. We further show that when no preemptions are permitted at all (i.e., k=0), the price is Θ (min {n, log P}). As part of the proof, we introduce the notion of the Bounded-Degree Ancestor-Free Sub-Forest (BAS). We investigate the problem of computing the maximal-value BAS of a given forest and give a tight bound for the loss factor, which is Θ(logk+1 n) as well, where n is the size of the original forest and k is the bound on the degree of the sub-forest.
AB - In this article we provide a tight bound for the price of preemption for scheduling jobs on a single machine (or multiple machines). The input consists of a set of jobs to be scheduled and of an integer parameter k ≥ 1. Each job has a release time, deadline, length (also called processing time), and value associated with it. The goal is to feasibly schedule a subset of the jobs so that their total value is maximal; while preemption of a job is permitted, a job may be preempted no more than k times. The price of preemption is the worst possible (i.e., largest) ratio of the optimal non-bounded-preemptive scheduling to the optimal k-bounded-preemptive scheduling. Our results show that allowing at most k preemptions suffices to guarantee a Θ(min {logk+1 n, logk+1P}) fraction of the total value achieved when the number of preemptions is unrestricted (where n is the number of the jobs and P the ratio of the maximal length to the minimal length), giving us an upper bound for the price; a specific scenario serves to prove the tightness of this bound. We further show that when no preemptions are permitted at all (i.e., k=0), the price is Θ (min {n, log P}). As part of the proof, we introduce the notion of the Bounded-Degree Ancestor-Free Sub-Forest (BAS). We investigate the problem of computing the maximal-value BAS of a given forest and give a tight bound for the loss factor, which is Θ(logk+1 n) as well, where n is the size of the original forest and k is the bound on the degree of the sub-forest.
KW - Scheduling jobs
KW - bounded preemptions
KW - bounded-degree sub-forest
KW - multiple machines
UR - http://www.scopus.com/inward/record.url?scp=85104822644&partnerID=8YFLogxK
U2 - 10.1145/3434377
DO - 10.1145/3434377
M3 - ???researchoutput.researchoutputtypes.contributiontojournal.article???
AN - SCOPUS:85104822644
SN - 2329-4949
VL - 8
JO - ACM Transactions on Parallel Computing
JF - ACM Transactions on Parallel Computing
IS - 1
M1 - 3434377
ER -