TY - JOUR
T1 - QUEUE WITH STARTER AND A QUEUE WITH VACATIONS
T2 - DELAY ANALYSIS BY DECOMPOSITION.
AU - Levy, Hanoch
AU - Kleinrock, Leonard
PY - 1986
Y1 - 1986
N2 - We show that the delay distribution in the queue with starter is composed of the direct sum of two independent variables: 1) the delay in the equivalent queue without starter, and 2) the additional delay suffered due to the starter's presence. Using this decomposition property, we easily derive the distribution of the delay suffered in the system with starter. This analysis is done for systems (both discrete and continuous time) whose interarrival times possess the memoryless property. Using this approach, we then analyze the M/G/1 system with vacation periods. First, we show that the M/G/1 with vacations can be considered as a special case of the M/G/1 with starter, so that the delay in the M/G/1 with vacations can be easily found by using the formula for the delay of the M/G/1 with starter. Second, using geometric arguments, we explain why the additional delay in the vacation system is distributed as the residual life of the vacation period.
AB - We show that the delay distribution in the queue with starter is composed of the direct sum of two independent variables: 1) the delay in the equivalent queue without starter, and 2) the additional delay suffered due to the starter's presence. Using this decomposition property, we easily derive the distribution of the delay suffered in the system with starter. This analysis is done for systems (both discrete and continuous time) whose interarrival times possess the memoryless property. Using this approach, we then analyze the M/G/1 system with vacation periods. First, we show that the M/G/1 with vacations can be considered as a special case of the M/G/1 with starter, so that the delay in the M/G/1 with vacations can be easily found by using the formula for the delay of the M/G/1 with starter. Second, using geometric arguments, we explain why the additional delay in the vacation system is distributed as the residual life of the vacation period.
UR - http://www.scopus.com/inward/record.url?scp=0022708016&partnerID=8YFLogxK
U2 - 10.1287/opre.34.3.426
DO - 10.1287/opre.34.3.426
M3 - ???researchoutput.researchoutputtypes.contributiontojournal.article???
AN - SCOPUS:0022708016
SN - 0030-364X
VL - 34
SP - 426
EP - 436
JO - Operations Research
JF - Operations Research
IS - 3
ER -