Abstract
Since January 2007 all accelerator equipment of the Phase 1 for the 40 MeV Proton/Deuteron Accelerator is at the SARAF site and installed for commissioning. The target for Phase 1 is to get the ECR ion source and RFQ into operation and to perform all relevant tests with the cryogenic module housing 6 superconducting half wave resonators, to show that the design values of the system can be reached. Based on those results the Phase 2 shall start, to reach the final energy of 40 MeV with up to 2 mA of protons and deuterons. The ECR ion source is in routine operation since June 2006, the RFQ already have been operated with protons and currently is under characterization. After the characterization is finalized it is anticipated to move the cryogenic module in the beam line and to perform further beam characterization. The entire beam characterization is closely followed by beam dynamics simulations. Recent results of the commissioning will be presented and comparisons made between measurements and beam dynamics calculations.
| Original language | English |
|---|---|
| Pages | 3452-3454 |
| Number of pages | 3 |
| State | Published - 2008 |
| Externally published | Yes |
| Event | 11th European Particle Accelerator Conference, EPAC 2008 - Genoa, Italy Duration: 23 Jun 2008 → 27 Jun 2008 |
Conference
| Conference | 11th European Particle Accelerator Conference, EPAC 2008 |
|---|---|
| Country/Territory | Italy |
| City | Genoa |
| Period | 23/06/08 → 27/06/08 |
Fingerprint
Dive into the research topics of 'PHase 1 commissioning status of the 40 MeV proton/deuteron accelerator SARAF'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver