Nesting planning based on production priorities and technological efficiency

Oded Maimon*, Arie Dayagi

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

6 Scopus citations

Abstract

The purpose and contribution of this work is in developing a methodology for integrating nesting technology with production priorities. Production priorities are based on a due-date (e.g., from an MRP-II program) and other management factors. A good nesting plan requires high raw material utilization. Economic operation demands low set-up frequency between nesting plans. These three factors usually conflict. We present here a parametric multi-objective mathematical programming formulation that takes account of these factors and their tradeoffs, and suggests an optimal solution to the problem.

Original languageEnglish
Pages (from-to)121-129
Number of pages9
JournalEuropean Journal of Operational Research
Volume80
Issue number1
DOIs
StatePublished - 5 Jan 1995

Keywords

  • Nesting planning
  • Production planning