Abstract
The purpose and contribution of this work is in developing a methodology for integrating nesting technology with production priorities. Production priorities are based on a due-date (e.g., from an MRP-II program) and other management factors. A good nesting plan requires high raw material utilization. Economic operation demands low set-up frequency between nesting plans. These three factors usually conflict. We present here a parametric multi-objective mathematical programming formulation that takes account of these factors and their tradeoffs, and suggests an optimal solution to the problem.
Original language | English |
---|---|
Pages (from-to) | 121-129 |
Number of pages | 9 |
Journal | European Journal of Operational Research |
Volume | 80 |
Issue number | 1 |
DOIs | |
State | Published - 5 Jan 1995 |
Keywords
- Nesting planning
- Production planning